● The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned ,designed and built in, not (72 ).
(72)
● The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned ,designed and built in, not (72 ).
(72)
● 网络安全设计是保证网络安全运行的基础, 以下关于网络安全设计原则的描述,错误的是 (20) 。
(20)
● Performing (74) involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.
(74)
● 下面关于企业资源规划(ERP)的叙述,不正确的是 (39) 。
(39)
● 在信息安全保障系统的S-MIS体系架构中,“安全措施和安全防范设备”层不涉及(58) 。
● 下列不能作为监理依据的是(65) 。
● Define Activities is the process of identifying the specific actions tobe performed to produce the (71).
(71)
● 风险的成本估算完成后,可以针对风险表中的每个风险计算其风险曝光度。某软件小组计划项目中采用 50 个可复用的构件,每个构件平均是 100LOC,本地每个 LO的成本是13元人民币。下面是该小组定义的一个项目风险:
1. 风险识别:预定要复用的软件构件中只有 50%将被集成到应用中,剩余功能必
须定制开发;
2. 风险概率:60%;
3. 该项目风险的风险曝光度是 (62) 。
● 范围控制的目的是监控项目的状态, 如“项目的工作范围状态和产品范围状态” ,范围控制不涉及(40) 。
(40)
● 黑盒测试注重于测试软件的功能性需求,主要用于软件的后期测试。 (30) 不能用黑盒测试检查出来。
(30)
● 某企业针对“新一代网络操作系统”开发项目进行可行性论证。在论证的最初阶段,一般情况下不会涉及到(42) 。
(42)